Thursday, 25 June 2015
New oak window liners
Our new oak window liners are finished and ready to be shipped to us. They were not cheap but will finish off the windows perfectly. Just hope my measurements were good and they fit ok.
Wednesday, 17 June 2015
Partition walls up.
I was going to use dowels on the door frame but it all became a bit complicated and time consuming! I therefore went for the trusted glue and screw method which performed very well.
We now put our attention to cladding the seating area. At first we were simply going to apply clad to the seat frame. I thought this looked a bit plain. A bit more time was spent cutting architrave with mitred 45' cuts. We think the finish looked superb, especially in oak. See pics below.
Monday, 8 June 2015
Stud walls go in..
A good weekend working on the boat. We have constructed the stud walls for the shower/toilet room. The room is about 4ft square. Big enough. We didn't want to lose the open plan feel. We used treated 25mm
by 35mm stud and have cladded in oak t&g. We intend to make a door for this room as 'normal' doors are way to heavy. I will make this in my garage this week and hopefully it will be ready to take down this Saturday.
Stud and cladding going up.
Toilet and shower tray to judge the size needed.
Not a bad size. Both stud walls now cladded and door to build.
Charlie, one of our Border Terriers can be seen looking for food!
Next visit to the boat will be this Saturday. We are enjoying the build and we think we are now really progressing well.
Friday, 5 June 2015
New shower cubicle.
We have purchased our new quadrant shower cubicle and tray. It is a reduced height cubicle at 1750mm high (even though box states 1900mm high!). The tray is 130mm high and the height in the cabin is 1970mm. So plenty to spare.