Monday, 31 August 2015
Galley - done!
I believe that we can now say that the galley is complete. Apart from a few minor things. We are pleased with the modern looking and practical galley. The black mono tap has yet to be tested but the water pump is wired and plumbed in.
Saturday, 15 August 2015
We have mains power
With the weather good, we thought it time to complete the 'hook-up'. The 2.5mm arctic cable was ran in a while ago. I terminated this on an external 'blue' type socket (by MK). It was attached to the control pillar and sealed in. We then had to make up a new extension cable from spare 2.5mm cable. Internally I have wired the AC to a MCB box. I have to purchase a galvanic isolator ASAP.
Mains socket with cable.
I have also purchased one of the cushions for the front seat/birth. 4" thick firm foam from trusted 'eFoam'. I put a temporary cover over it but we will need to get some covers made up.
Somewhere to sleep!More to come ....
Sunday, 2 August 2015
Galley coming together.
The galley (or kitchen in your house) is really coming together. The kitchen units are in. The worktop is in and cut for the sink/cooker. The cooker has been fitted and looks good. It was a bit of a pain getting it in but eventually it went in ok. The gas is still to run in. It has been difficult to find a gas safe registered LPG fitter. We are still looking!
We fitted a couple of the solid oak doors so that we could judge the size. They look good and the galley is almost complete. We still have the sink to secure, gas to do and all the plumbing (taps and water pump).
Cooker going in.