The shower cubicle.
Top of the cubicle with 3 cm to spare!
The water has been pressurised and all ok except a small leak on one of the joints.
Pipe work to calorifier and shower/sink.
It is nice to have running water. The system was pressurised with the pump and we monitored it for an hour to see if it was water tight. All ok but we isolate the 432 litre tank and the 50 litre calorifier when we leave the boat, just in case.
I would say about 90-95% fitted out. Almost there!